Culture


Professional, efficient and enthusiastic service Tianjin Lingang Port Group successfully completed the loading task of 3.5 million tons of Indonesian Dexin Steel Phase I "Belt and Road" project


On the morning of November 20th, as the last piece of equipment was successfully hoisted into the "HUANGHAI PIONEER" ship docked at No. 10 wharf of Dagu Port area in Tianjin Port Free Trade Zone, Tianjin Lingang Port Group successfully completed the loading task of 3.5 million tons of Indonesian Dexin Steel Phase I "Belt and Road" project. We have once again made our contribution to the Belt and Road Initiative.

It is known that 3.5 million tons of Indonesian Dexin Steel Phase I "One Belt and One Road" project goods are to provide construction materials and equipment facilities for a large joint steel enterprise located in the Qingshan Industrial Park in Morawal County, Sulawesi Province, Indonesia. The project scale is "3.5 million tons + 1.5 million tons reserved". After the completion of the iron and steel enterprise will set coking, sintering, iron making, steel making, rolling steel as a whole, the main products are bar, wire and billet. The shipping work of the project was settled in the Dagu Port area of Tianjin Port Free Trade Zone in 2018. From the sailing of the "Treasure of Wind" on September 11, 2018 to the departure of the "Yellow Sea Pioneer" on November 20, 2019, the project lasted 14 months, and 21 cargo ships loaded a total of 12,852 pieces of equipment, totaling 267,802 square meters.